neverceasetobeamazed Posted February 14, 2019 Share Posted February 14, 2019 I am in UK. I would like to have built a 7m x 5m garage with sloping roof. Builder has said he wants 20,000 baht for construction. I would buy materials. I know what a garage costs here in UK but no idea for Thailand. I plan to visit shortly to supervise. Would appreciate info on material costs if anyone has knowledge of this. Link to comment Share on other sites More sharing options...
eyecatcher Posted February 14, 2019 Share Posted February 14, 2019 Can I ask if you gave the builder an identical spec to what you just posted here? If not why not? If he wants 20k then I shudder to ask what he will achieve in his four or five days for his team. I never cease to be amazed by people asking the forum to guess what they want Link to comment Share on other sites More sharing options...
Anythingleft? Posted February 14, 2019 Share Posted February 14, 2019 Yeah you are going to get a good deal for basically 400 quid, I have a niggle that this might not go as planned....Sent from my SM-N950F using Tapatalk Link to comment Share on other sites More sharing options...
bankruatsteve Posted February 14, 2019 Share Posted February 14, 2019 Well, 20K is probably what a "builder" would charge. You could get day labor to do it for a lot less but then you would be the "builder". Up to you. Link to comment Share on other sites More sharing options...
KittenKong Posted February 16, 2019 Share Posted February 16, 2019 On 2/14/2019 at 5:37 PM, neverceasetobeamazed said: a 7m x 5m garage with sloping roof That's a pretty vague spec. Walls? Doors? Foundations? Slab? Exterior finish? Interior finish? Link to comment Share on other sites More sharing options...
Tanlic Posted February 16, 2019 Share Posted February 16, 2019 On 2/14/2019 at 8:30 PM, bankruatsteve said: Well, 20K is probably what a "builder" would charge. You could get day labor to do it for a lot less but then you would be the "builder". Up to you. Nonsense ....how can you say that without knowing the spec? Link to comment Share on other sites More sharing options...
bankruatsteve Posted February 16, 2019 Share Posted February 16, 2019 9 minutes ago, Tanlic said: Nonsense ....how can you say that without knowing the spec? Maybe the same way of BS comments. You don't know what I know. Link to comment Share on other sites More sharing options...
Tanlic Posted February 16, 2019 Share Posted February 16, 2019 As I said much depends on your spec but I imagine you will use breeze blocks then cement render the walls If the ground is already land filled and you are putting a slab down without footings and using precast columns and a light metal roof then that is the cheap way. If you are tiling the roof which I doubt at the labour cost quoted I would have 6 pads 100 x 100 and 20 x 20 columns to ensure no structural cracks as you have a 5ft span front and back. If you use breeze blocks (Make sure they use ties ) you need about 630 + breakages and they are 6.5 baht each.....Cement is 120 baht 40kg bag If you use super block (aerated) you need 420 @16.5 baht to 21 baht depending where you are...They are fixed with a special glue cement which again is Door standard 1000 baht door 1200 baht handle and hinges 500 baht window about 4000 baht for aluminium Your floor to support a car? Cpac will charge 2280 per cube so depending on thickness 1 cube 10sqm if 10mm thick 7.5 ifr 15mm thick Mesh is ceap so I would also lay some down before concreting. Last time we did a metal roof it cost 500 baht psm but that was 6 years ago..probably not much more than that as yours is just sloped. Add a garage door and you are going to be about 110k which is half the price of average building costs Then you have electricals and water??? Depending on how you build it you are talking 80 to 130 k A company would charge you 8000 baht per sqm which is twice as much Link to comment Share on other sites More sharing options...
Tanlic Posted February 16, 2019 Share Posted February 16, 2019 If your builder is charging you 20k bite his hand off it's simple maths 4 people at 500 baht per day 2000 baht * 8 days leaves the guy 4000............they never finish when they say they will and won't finish in 2 weeks trust me I wouldn't hand mix the concrete unless your builder is A1..CPAC computerize their concrete mix..lazy Thais use to much water so the mix is easier too work with and you end up with a map of the grand canyon Link to comment Share on other sites More sharing options...