Rimmer Posted April 6, 2019 Share Posted April 6, 2019 Soi Buakhao pump installation ends May 22 PATTAYA:--Traffic delays caused by construction will continue for another month on Soi Buakhao as workers install new pumps, flood basin and electric transformer. Contractor Proper Solution Co. began working on the reinforced-concrete flood culvert in November. Two pumps also are being installed, along with a transformer and electric meter. Jirawat Plukjai, president of the Chumsai Community, said the project plan had to be changed because workers hit groundwater about four meters deep. So the basin is now being made wider instead of deeper. Central Pattaya residents have complained about Soi Buakhao frequently being closed during construction, something that’s not about to change. The project is slated to run through May 22. -- PATTAYA MAIL 2019-04-06-- Link to comment Share on other sites More sharing options...
roo860 Posted April 6, 2019 Share Posted April 6, 2019 Pump Station?[emoji23][emoji23]Sent from my SM-G920F using Thailand Forum - Thaivisa mobile app Link to comment Share on other sites More sharing options...
WildBillHiccup Posted April 7, 2019 Share Posted April 7, 2019 "Soi Buakhao pump installation ... ... ends May 22 - 2019?" Place Your Bets .. .. .. There's a great little Bar hidden away behind the ripped blue tarpaulin called "Tom's Target Bar" Link to comment Share on other sites More sharing options...
Basil B Posted April 7, 2019 Share Posted April 7, 2019 2 hours ago, Kim J said: Where is this water going to be pumped to? I can not help but think this project will turn into yet another debacle. If the contractor was British Rail I am sure next time the Soi floods they would blame it on the wrong type of rain. Link to comment Share on other sites More sharing options...
essox essox Posted April 8, 2019 Share Posted April 8, 2019 what time? Link to comment Share on other sites More sharing options...
Recommended Posts