snoop1130 Posted June 23, 2016 Share Posted June 23, 2016 Road closures in Koh Kaew may last until OctoberKongleaphy KeamConstruction crews are installing a retaining wall along the now-swollen channel. Photo: Wes MartinPHUKET: -- Parts of Soi Koh Kaew 33, behind the Isuzu showroom off Thepkrasattri Road in Koh Kaew, are under construction, with crews warning that road closures may inconvenience local residents and workers, including the staff at the Phuket Gazette.Construction crews reportedly have an 8.4-million-baht budget to build a retaining wall along the side of the soi. Large backhoes and drilling equipment are laying the groundwork along the now-swollen channel that runs parallel to the road.The wall will be 500 meters long and about three meters tall, says Khuakiet Chitkhua, president of the Koh Kaew Tambon Administration Organization (OrBorTor). We expect to be done with the project by October, but it could be earlier or later than that, depending on the weather.Full Story: http://www.phuketgazette.net/phuket-news/Road-closures-Koh-Kaew-may-last-until/64112?desktopversion-- Phuket Gazette 2016-06-23 Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.